RESIDENTIAL

RESIDENTIAL PROJECTS

Residential Projects


West Hills

Installed retaining wall.

West Hills

Installed retaining wall.

Camas Slide

Landslide remediation.

Camas Slide

Landslide remediation.

Hidden Abode Hazel Dell

Failed UltraBlock retaining wall caused foundation settlement. Underpin failing foundation with helical piers, foundation brackets, and helical tieback anchors. Remove and replace failing Ultrablock MSE retaining wall. Lifted the and leveled the foundation. Removed and replaced interior concrete slab.

Salmon Creek

Replaced Failed modular block retaining wall with a pin pile retaining wall. Temporarily supported and leveled the deck. Replaced deck post and concrete deck footings.  Installed new deck footings and posts. Lifted the deck back to its original position. Replaced a failed Keystone retaining wall with a pin pile and wood lagging wall

Salmon Creek

Replaced Failed modular block retaining wall with a pin pile retaining wall. Temporarily supported and leveled the deck. Replaced deck post and concrete deck footings.  Installed new deck footings and posts. Lifted the deck back to its original position. Replaced a failed Keystone retaining wall with a pin pile and wood lagging wall


Hidden Abode Hazel Dell

Failed UltraBlock retaining wall caused foundation settlement. Underpin failing foundation with helical piers, foundation brackets, and helical tieback anchors. Remove and replace failing Ultrablock MSE retaining wall. Lifted the and leveled the foundation. Removed and replaced interior concrete slab.

Hidden Abode Hazel Dell

Failed UltraBlock retaining wall caused foundation settlement. Underpin failing foundation with helical piers, foundation brackets, and helical tieback anchors. Remove and replace failing Ultrablock MSE retaining wall. Lifted the and leveled the foundation. Removed and replaced interior concrete slab.



Lake Oswego

 Installed shear pile for hillside support using excavator, pole handler, and 800 lbs. pneumatic hammer.  

Supplied and installed 35 to 43 foot deep shear piles to stabilize a steep slope between the road and the house below.

Lake Oswego

 Installed shear pile for hillside support using excavator, pole handler, and 800 lbs. pneumatic hammer.  
Supplied and installed 35 to 43 foot deep shear piles to stabilize a steep slope between the road and the house below.


Fairmont

 Installed drilled and grouted micro-piles and tiebacks for a new addition to residential structure.

Fairmont

 Installed drilled and grouted micro-piles and tiebacks for a new addition to residential structure.